Schedule: finalise installation of NEN and NWN, rearange all cablings
15 June 2026 : Start installation around 15:00 utc
- Position adjustements for NEN setup:
- Adjust zero positions with jig for North East setup in /virgoData/VirgoOnline/SNEB_dbox_rack.cfg:
NEF lateral NEF Vertical NEM Axial NEM Vertical NEN Lateral NEN Vertical Old values -7.661 -7.03 7.435 8.225 7.954 7.306 New values -7.1195 -6.7015 7.1135 6.607 6.651 7.06 - Mean of sensors values now 0 within 1 micron precision.
- Remove jigs and align setup to better than 0.05 mm (see NEB_EastSetupAlignment histograms)
- Adjust zero positions with jig for North East setup in /virgoData/VirgoOnline/SNEB_dbox_rack.cfg:
- Position adjustements for NWN setup:
- Adjust zero with jigs in /virgoData/VirgoOnline/SNEB_dbox_rack.cfg :
NWF lateral NWF Vertical NWM Axial NWM Vertical NWN Lateral NWN Vertical Old values 7.05 -7.12 -7.753 6.7530 -8.035 7.063 New values 6.777 -6.9343 -6.9823 6.7602 -6.9060 6.7322 Means of sensors values below 1 micron now
-
Remove jigs and align setup to better than 0.05 mm (see NEB_WestSetupAlignment histogram)
- Adjust zero with jigs in /virgoData/VirgoOnline/SNEB_dbox_rack.cfg :
- Position adjustements for NSN setup:
- Adjust zero with jigs in /virgoData/VirgoOnline/SNEB_dbox_rack.cfg:
NSF Lateral NSF Vertical NSM Axial NSM Vertical NSN Lateral NSN Vertical Old values -7.444 7.619 -7.361 -7.691 7.004 -7.764 New values -7.0234 7.2171 -7.0236 -7.3403 6.4019 -7.3625 Mean sensor values below 3 micron now
- Night pause...Continue on June 16th (7:00 utc)
- Remove jigs and align setup to better than 0.05 mm (see NEB_SouthSetupAlignment histogram)
- Adjust zero with jigs in /virgoData/VirgoOnline/SNEB_dbox_rack.cfg:
At the end of the intervention we have :
Box 2021-08 (R4-32) on NSN with LED "away" from mirror
Box 2024-12 (R4-12) on NEN with LED "away" from mirror (and generating loop attached)
Box 2021-04 (R4-30) on NNN with LED "close" to mirror
Box 2024-10 (R4-10) on NWN with LED "away" fro mirror. It produces more accoustic noise than the others
The rotor cables for NWN have been installed
All rotors have been tested during few minutes at 50Hz.The difference in acoustic noise between the NNN and the others was less noticeable than at the nominal frequency.
All microphones gain have been set to 40dB (East and West setup were at 60dB. South was at 40 dB... We don't remember for North).
All temperature sensor gains have been adjusted to follow the new cabling on the DAQ boxes.
NB: During the NCal power supply reshuffling, we touched the ring heater power supply connector and the power supply switched off for a short time (on 15 June 15:30 UTC). Ring heater experts will come to check.