Reports 1-1 of 1 Clear search Modify search
AdV-SBE (EIB-SAS commissioning)
bulten, melo, lagabbe, derossi - 12:43 Friday 17 April 2026 (69009) Print this report
EIB rebalancing
after work on the bench we rebalanced with countermasses. The loop can be closed with corrections below 2V which is fine. With the bench in blocked position ( put some 5kg extra) the nominal position is reached within about 10 microrad/micrometer. the driver of the microsprings may need attention; sometimes the driver runs the springs away towards the opposite endswitch without warning,
Search Help
×

Warning

Error

The present report has been modified outside this window. Please check for its integrity in the main page.

Refreshing this page will move this report into drafts.

×