Acl update with v1r39p17
As described here , the first block has been done this morning in 2 parts
- First part
- Second part
- SNEB_rtpc Acl servers update
- operations performed between 2026-02-23-07h32m01-UTC and 2026-02-23-07h42m37-UTC
- After these operations
- the SNEB LC loops, the SNEB SBE loops and the NEB NCal loops were successfully closed
- The NEB_NNC_Tilt server running parameters (set poin and gain) were restored but the loop remains open
- The ITF has been successfully locked upto LOW_NOISE_3_ALIGNED
Update with Fd v8r65p1
- the storage-stol02 's Fd servers have restarted with latest v8r65p1 Fd version
- operations performed between 2026-02-23-08h03m58-UTC and 2026-02-23-08h09m26-UTC