Reports 1-1 of 1 Clear search Modify search
AdV-ALS (End arm injection)
casanueva, spinicelli - 14:54 Monday 15 September 2025 (67708) Print this report
WE green power recovered

This morning Piernicola warned us that the green generation at the WE was systematically reaching low levels, making the amplifier reach 0 at times, since there was not enough seed. I went this morning to the end building and try to place better the optical fibers. I recovered around 2.3 mW of stable seed so I let it like that. To be monitored.

Search Help
×

Warning

Error

The present report has been modified outside this window. Please check for its integrity in the main page.

Refreshing this page will move this report into drafts.

×