Reports 1-1 of 1 Clear search Modify search
On-call intervention (General)
Oncall-system - 19:17 Friday 12 September 2025 (67691) Print this report
On-call intervention

The following report has been submitted to the On-call interface.

On-call events -> Air Conditioning

Title: CEB Hall termoregulator out of service

Author(s): soldani

Called at: 17:15, 12-09-2025, by: Alarm or monitoring system
Remote intervention: Started: ; Ended:
On-site intervention: Started: 17:39, 12-09-2025; Ended: 19:20, 12-09-2025
Status: Action pending
Operator when issue resolved: Gherardini

Details:

Following this afternoon's blackout, the Eurotherm thermostat that controls the CEB hall temperature is no longer functioning. As a mitigating measure, I manually adjusted the opening percentages of the hot and cold water valves for the respective coils inside the AHU to the average values ​​maintained over the past few days.

* Note that any files attached to this report are available in the On-call interface.

Search Help
×

Warning

Error

The present report has been modified outside this window. Please check for its integrity in the main page.

Refreshing this page will move this report into drafts.

×