WE payload integrated and final set up
The payload has been set up. The work took some time in the morning as this is the system that has the lowest frequencies for pitch and roll Ma-Mi common modes. However, thanks to the beneficial effects of Eriobotrya japonica fruits (medlar), found in control room and consumed in considerable amount, everything went smoothly and at 18:45 the work completed, including pre-alignment WRT mirror reference OpLev and TCS Hartmann (a dedicated entry will follow).

Green light for the vacuum, supposed to start around 10-11 pm

The setup of the OpLevs must be revised because this time the alignment Mi VS Ma is significantly worse. during the assembly it was assessed to be ~1 mrad off, but indeed, once suspended it was larger. We can cope with that ~2.5 mrad, but the lens and the sensor have to be properly reset. It will be done once we re-lock the system, next week.

a special thank to VAC crew assistance
Images attached to this report
Comments to this report:
boldrini, ruggi, majorana - 17:11 Wednesday 28 May 2025 (66863) Print this report

We checked the alignment of the optical lever beam on the lens, and found it acceptable (Fig.1, lines are hand drawn and only serve as a general indication).

We proceeded to adjust the position of the psd to recenter the beam on the sensor's surface (Fig.2).

The operation was successful.

Images attached to this comment
Search Help
×

Warning

Error

The present report has been modified outside this window. Please check for its integrity in the main page.

Refreshing this page will move this report into drafts.

×