Reports 1-1 of 1 Clear search Modify search
AdV-DET (Commissioning)
frappez, mwas, gouaty - 10:28 Monday 05 May 2025 (66711) Print this report
Comment to Installation of an OMC cavity on the B1s beam (EDB bench) (66590)

Attached is a brief document summarizing the characteristics of the preamplifiers SN 220 and SN 221 (and the validation measurements) that were installed together with the photodiodes B1s and B1t on EDB. The second document shows the schematic of the preamplifier.

Non-image files attached to this comment
Search Help
×

Warning

Error

The present report has been modified outside this window. Please check for its integrity in the main page.

Refreshing this page will move this report into drafts.

×