This morning we installed the new PDU at the WE building.
Start of the installation: 10:24 (local time)
End of the installation: 10:40
During the installation, ID, F7 and LC loops were kept closed during the whole process.
After the installation, we checked if the motors were working properly.
This operation took about one hour, due to some communication problem with the motors' server. After killing the process and rebooting, communication was restored and the tests on the motors were performed successfully.
We took the opportunity also to recenter the WE tower, both horizontally and vertically.
All the operations ended at 11:40 (local time).
NB: Shortly after the installation of the PDU, L. Rolland observed a series of glitches on the WE photon calibrator. Some checks have been performed to understand if there is a correlation between the glitches and the motors' cabling, but the results were inconclusive. We thus decided to temporarily unplug the motors, so that Rolland can continue to study these glitches.