Reports 1-1 of 1 Clear search Modify search
AdV-PAY (PAY Test Facility)
boldrini, zaza, majorana - 17:51 Wednesday 26 March 2025 (66448) Print this report
Preliminary clean-up of PAY lab in 1500W

We cleaned up the PAY lab at 1500W to prepare it for the deep cleaning tomorrow.

We removed as much material as possible and moved the bulkiest elements (Fig.1) away from the corners of the room to facilitate cleaning (Figs.3-4)

The smaller components and tools were packed in boxes on the shelves on the left side of the room (Fig.4), with bolts and Screws on the right (Fig.5).

In particular, instructed by Ettore, we disassembled the optical benches that hosted the local control of the LM payload in the vacuum chamber, and cleaned up cables and aluminum parts scattered around the area. We collected the components removed by the benches and the smaller pieces from the corners in the two boxes in the shelf on the opposite side of the room (Fig.6).

The larger pieces, like the optical benches themselves, were stored in the adjacent room that connects to the fiber lab (Figs.7-8-9).

We also found what we suppose to be the new WE mirror on the payoad table (Fig.10)

Images attached to this report
Comments to this report:
majorana - 19:14 Wednesday 26 March 2025 (66449) Print this report
On behalf of the PAYload (sub)System I searched suitable words to express my gratitude for this work. But I did not find the good ones.
Search Help
×

Warning

×