Reports 1-1 of 1 Clear search Modify search
Vacuum (Detection)
Vacuum, Menzione - 19:00 Monday 22 July 2024 (64765) Print this report
DT tower venting

Today around 16h LT we started venting the DT tower

Notes:

  • the SR-BS valve is closed to block the beam and to provide isolation redundancy
  • the cleanroom supply air has been set to 'normal mode'
  • the tower air supply system is ON
  • extra noise is now produced in the CEB hall
Search Help
×

Warning

Error

The present report has been modified outside this window. Please check for its integrity in the main page.

Refreshing this page will move this report into drafts.

×