Today, as of 10:00 UTC, two new accelerometers were installed and acquired in the CEB, positioned on the turbo pumps of the IB and PR towers.
Their name is
- ENV_IB_TURBO_ACC (SN 5031)
and
- ENV_PR_TURBO_ACC (SN 5005)
The goal is to monitor the vibrations of these pumps as best as possible, because we think that their line around 401 Hz (and also the harmonics) are visible in hrec.
Note that while IB's turbo pump is directly connected to the tower itself, PR's is via a bellows which should introduce a seismic decoupling. Its effect in hrec should therefore be less. However, the two accelerometers were mounted in the same way: connected to the pump body.
Note: there are low frequency lines that are coherent between these two accelerometers at 16.43 Hz, 18.53 Hz and 44.64 Hz