Reports 1-1 of 1 Clear search Modify search
Environmental Monitoring (Environmental Monitoring)
Paoletti, Fiori - 12:37 Tuesday 01 August 2023 (61062) Print this report
Accelerometers installed on IB and PR turbo pumps

Today, as of 10:00 UTC, two new accelerometers were installed and acquired in the CEB, positioned on the turbo pumps of the IB and PR towers.

Their name is

  • ENV_IB_TURBO_ACC    (SN 5031)

and

  • ENV_PR_TURBO_ACC   (SN 5005)

The goal is to monitor the vibrations of these pumps as best as possible, because we think that their line around 401 Hz (and also the harmonics) are visible in hrec.
Note that while IB's turbo pump is directly connected to the tower itself, PR's is via a bellows which should introduce a seismic decoupling. Its effect in hrec should therefore be less. However, the two accelerometers were mounted in the same way: connected to the pump body.

Note: there are low frequency lines that are coherent between these two accelerometers at 16.43 Hz, 18.53 Hz and 44.64 Hz

Images attached to this report
Comments to this report:
Paoletti - 16:17 Tuesday 01 August 2023 (61071) Print this report
Images attached to this comment
Paoletti - 9:38 Tuesday 08 August 2023 (61162) Print this report

Today at 07:36 UTC the two accelerometers have been removed.

Search Help
×

Warning

Error

The present report has been modified outside this window. Please check for its integrity in the main page.

Refreshing this page will move this report into drafts.

×