Reports 1-1 of 1 Clear search Modify search
AdV-ALS (Green sources)
casanueva, berni, carbognani, derossi, gosselin, masserot - 17:43 Wednesday 15 March 2023 (59266) Print this report
Implementation of ALS new tigger

This morning we tested and implemented the new trigger shown in entry #59250. We adjusted the values of the trigger, implementing an asymmetric one, and in order to be consistent with the way we tuned before the triggers, we also are using the new channel to check if the green is locked. The lock check value is the same as the lower trigger. FIgure 1 shows an example of a lock.

In order to come back to the previous situation is enough to comment line 284 and uncomment 283 in ALS_NARM.py and retune the numbers. Also to replace the lock check signal by the old one in lines 305, 68 and 71.

We also tuned the DMS flags that monitor the transmission of the green cavities only when the shutters are opened, to check possible drifts.

Images attached to this report
Search Help
×

Warning

Error

The present report has been modified outside this window. Please check for its integrity in the main page.

Refreshing this page will move this report into drafts.

×