Reports 1-1 of 1 Clear search Modify search
AdV-INJ (ITF Mode Matching Telescope)
derossi, gosselin - 20:20 Monday 01 August 2022 (56600) Print this report
matching of the beam on the west arm with chrocc on

After switching on the CHRoCC on PR at 0.6 V on the DAC (to give the right curvature 56597), and with PR RH off, we optimized the matching on the west arm by moving the L1 lens on SIB1 along z and the counter weight to keep the corrections Sc_IB_MAR_TZ_CORR in the range (as usual).

The first measurement of the mismatch gave us 18% for the North arm and 12% for the west. We then performed the steps summarized in the following table

scan # GPS UTC actuator number of steps direction
1 11:50      
2 12:48 L1z 20000 backward
3 13:18 - 50000 forward
4 13:42 - 60000 -
5 14:02 - - -
6 14:25 - 40000 -
7 15:18 - 20000 -
8 15:43 - - -
  15:47 CW 60000 forward
  16:17 L1z 20000 forward
9 16:44 - - -
10 17:10 - - -
11 17:30 - 30000 -
12 17:45 - 30000 -
  18:13 - 60000 backward

The mismatch for the west arm is now around 1.3% and for thee north 2% (see attached plot).

 

Images attached to this report
Search Help
×

Warning

×