Last week we completed the 18th height monitoring campaign of the North Tunnel.
Tab.1 summarizes the result of the survey and Fig.1 shows the tunnel profile, that reports graphically the trend of the subsidence over time.
Last week we completed the 18th height monitoring campaign of the North Tunnel.
Tab.1 summarizes the result of the survey and Fig.1 shows the tunnel profile, that reports graphically the trend of the subsidence over time.