AdV-SIN (Pre-commissioning)bertolini, vardaro, tacca - 19:25 Monday 19 April 2021 (51464)
Print this reportComment to SQB1 temporary blocked (51173)The stepper motor has been repaired at Nikhef and shipped back to the site. Today we reinstalled in on SQB1 mSAS. Everything should be ready to re-suspend the bench.