Today around 18h10 utc, the angular controls of the SDB1 bench (marionetta actuator) and the OMC temperature control have been disabled in preparation of the venting of the detection tower that will take place tomorrow.
Today around 18h10 utc, the angular controls of the SDB1 bench (marionetta actuator) and the OMC temperature control have been disabled in preparation of the venting of the detection tower that will take place tomorrow.