Reports 1-1 of 1 Clear search Modify search
AdV-FLT (Installation)
ciardelli, dattilo, menzione - 17:53 Wednesday 25 November 2020 (50029) Print this report
transportation of IM microtower from 1500N building to inside the FC-IM clean room
This morning the FC-IM microtower has been transported from 1500N building (fig1) to inside the FC-IM clean room.

As preparatory work, yesterday afternoon, Marco and Nicola made a further improvement to the transportation cart, by strengthening the 2 additional stabilizing wheels (fig2), to be able to face the path on the external road (fig3), which is rather bumpy.
The microtower was placed on the 8-wheel plate, to allow the passage from the trolley to the clean room, and in turn, loaded on the modified cart. A description of the system is in #49952.
At the end of the tranportation, the microtower was left on the 8-wheeled plate (fig4). Once the clean room hoist is installed and operational, the final handling of the microtower will be performed.
Images attached to this report
Search Help
×

Warning

×