AdV-AEI Squeezer Integration (Modifications to detection bench)
grimaldi tacca zendri - 17:35 Friday 31 July 2020 (49147) Print this report
Removal of SQZ cables from DET lab

In order to prepare the EE room and the Detection lab for the infrastructural works we:

  1. Remove all the SQZ cables from DET lab and sealed the holes (Figure 1)
  2. Covered the Spectrum Analyzer in EE room.(Figure 2 ). 
  3. Moved the RF generator HP8656B and some cables to the Padova-Trento office.(Figure 3 )
  4. Prepared the cover for the racks in EEroom (Figure 4, 5, 6,7). Now all the racks are open and they will be closed only during the infrastructural works.

 