In order to prepare the EE room and the Detection lab for the infrastructural works we:
- Remove all the SQZ cables from DET lab and sealed the holes (Figure 1)
- Covered the Spectrum Analyzer in EE room.(Figure 2 ).
- Moved the RF generator HP8656B and some cables to the Padova-Trento office.(Figure 3 )
- Prepared the cover for the racks in EEroom (Figure 4, 5, 6,7). Now all the racks are open and they will be closed only during the infrastructural works.