Reports 1-1 of 1 Clear search Modify search
Virgo Runs (O3)
amagazzu - 6:57 Sunday 08 December 2019 (47878) Print this report
Operator Report - Night shift

ITF found in Science Mode, it kept the lock for the whole shift.
ITF in Adjusting mode from 3:41 UTC to 4:11 UTC in order to recovery the vertical correction of SDB2 SBE.

Guard Tour
23:30 UTC - 0:03 UTC;
1:31 UTC - 2:00 UTC;
3:34 UTC - 4:05 UTC;
5:00 UTC - 5:33 UTC.

Sub-system reports

Air Conditioning
The temperature of the UPS room in the Technical building stabilized after the intervention ( see attached plot #1 ).

SBE
During the shift the vertical correction of SBD2 SBE steadily increased ( see attached plot #2 ). From 3:41 UTC to 4:11 UTC I used the related motor to decrease the correction. After the intervention the value started increasing again.

Pending actions

Air Conditioning
(07-12-2019 19:00 - ) check the behavior of INF..TB_UPS_TE,

DAQ
(07-12-2019 16:00 - ) At next unlock unplug and replug MuxDemux 11in DAQ Room in order to restore environmental channels (grey flags on DMS) - contact DAQ OnCall.

SBE
(07-12-2019 19:00 - ) check the behavior of SBE_SDB2_ACT_F0V.

Images attached to this report
Comments to this report:
bertolini - 10:38 Sunday 08 December 2019 (47880) Print this report

The drift of the vertical degrees of freedom of the SDB2 suspension follows the drift of the bench temperature (see plot) that keeps rising due to the malfunctioning of the DET ACS; further re-adjustment with the step motors will be needed till the problem is solved.

Images attached to this comment
Search Help
×

Warning

×