The commissioning activities CO2 lasers activities and scattered light on EIB were were concluded at 17:00 UTC.
After an initial alignment of the cavities we were able to reach LOCKED_RECOMBINED; in this state we had a problem with the node DET_MAIN which was stuck in the state CHECK_SHUTTER_CLOSED preventing to go ahead with the lock acquisition. I tried to restore the situation by putting the node in INIT, reloading the code and also restarting the node; unfortunately these actions did not solve the problem. At 18:20 UTC I contacted the on-call who started working from remote.
At present the problem is still unsolved; Bas, Romain and Michal are working from remote together with Marco, Enzo and Michele in Control room.
Sub-system reportsAir Conditioning
At 14:10 UTC UTA INJ in "Portata ridotta"
DET
(07-10-2019 18:20 - ) From remote
Status: On-going
Description: DET_MAIN stuck in CHECK_SHUTTER_CLOSED with ITF locked in LOCKED_RECOMBINED.