Reports 1-1 of 1 Clear search Modify search
AdV-TCS (CO2 laser projector)
aiello, bersanetti, nardecchia, ruggi - 16:49 Thursday 30 May 2019 (45995) Print this report
TCS/ISC shift
This morning we tried to tune the ITF working point by setting the previous values of WI DAS.
Keeping fixed the powers of the NI DAS (NI IN:310 mW, NI OUT:2.25 W), we changed the WI power values:
10.35 UTC : WI IN: 80 mW-> 130 mW
WI OUT: 300 mW -> 17 mW

After the CP thermalization, Paolo and Diego closed the BS in the full bandwidth and they changed the alignment offeset to find a good compromise between the sidebands and the dark fringe.
In attachment you can find the comparison of B1p, B4_112MHz and CMRF between today (42Mpc-blue curves) and April 30th (50 Mpc-red curves):
-today the sidebands are higher;
-the CMRF is better;
-the B1p is the same,
but we are not able to recover 50 Mpc.

Thus it seems that the lack of Mpc is not related to the alignment working point.
Food for thoughts: comparison of the sensitivity curves is also attached (figure 2).




Images attached to this report
Comments to this report:
mwas - 8:01 Friday 31 May 2019 (46002) Print this report

After the TCS/Alignment work the ITF optical gain dropped, and the squeezer performance is lower. It would be good to check the OMC alignment and mode match, as the SDB1 alignment drift control is done in only 2 out of the 4 degrees of freedom.

Images attached to this comment
Search Help
×

Warning

Error

The present report has been modified outside this window. Please check for its integrity in the main page.

Refreshing this page will move this report into drafts.

×