AdV-TCS (CO2 laser projector)
carbognani - 9:35 Wednesday 20 February 2019 (44938) Print this report
Comment to Rotation Stage replacement on the CO2 benches (44909)

One of the main problem experienced yesterday was that the machine actusb2 was rebooted and after the reboot its configuration was not correct. This has been fixed by Giuseppe and the PyAgilisRot application could be now restarted.

In case of big troubles always check that the corresponding process on actusb2 are not running and in case kill them logging as virgorun.

For this setup we are borrowing the machine actusb2 (installed with SL6) from INJ and we are running there an instance of the PyAgilis software driving the Agilis 8 channel controller. The 2 servers dedicated to the control of the previuos rotators have been removed.

For data collection, the FbmMain configuration has been correspondingly updated and the 8 channels named:

  1. TCS_CO2_Channel1_Axis1_Position
  2. TCS_CO2_Channel1_Axis2_Position
  3. TCS_CO2_Channel2_Axis1_Position
  4. TCS_CO2_Channel2_Axis2_Position
  5. TCS_CO2_Channel3_Axis1_Position
  6. TCS_CO2_Channel3_Axis2_Position
  7. TCS_CO2_Channel4_Axis1_Position
  8. TCS_CO2_Channel4_Axis2_Position

Are now available on the DAQ (See Fig. 1)

Images attached to this comment