Reports 1-1 of 1 Clear search Modify search
Environmental Monitoring (Environmental Monitoring)
fiori, singh, tacca, tringali - 18:58 Tuesday 25 September 2018 (42788) Print this report
Seismic survey in the North tunnel for the future FDS filter cavity

In order to make a seismic survey of the tunnel North for the future installation of the FDS filter cavity, today we placed a Trilium seismometer around 50 m far from the BS tower. In particular, we placed it on the floor in correspondence of a pillar.  A portable data aquisition system is used to acquire and store data. A GPS antenna is connected to the same system and carried out of the tunnel to synchronized data. Data acquisition started at 17:30 LC. Tomorrow we will install a second Trillium seismometer in a different position along the tunnel beam.

Few pictures in the attachments.

Images attached to this report
Comments to this report:
fiori, singh, tacca, tringali - 11:06 Wednesday 26 September 2018 (42792) Print this report

Today we installed a second seismometer in the middle of the "supporting beam" around 50 m. Measurement started at 10:45 LC.

Images attached to this comment
fiori, singh, tacca, tringali - 10:59 Thursday 27 September 2018 (42811) Print this report

Today, between 10:45 and 10:53 LC, we moved one seismometer form the "supporting beam" to the "carried beam".

Images attached to this comment
singh, tacca - 12:28 Friday 28 September 2018 (42833) Print this report

Today, betweeen 11:30 and 12:15 LC we installed the seismometers around 350 m from the BS: we placed a sensor in correspondence of a pillar and a sensor in the middle of the "supporting beam". We installed a second GPS antenna outside the tunnel and we checkes that everything is working. On Monday we will start to acquire data.

Images attached to this comment
fiori, singh, tacca, tringali - 15:42 Monday 01 October 2018 (42854) Print this report
Today, measurement started at 15:20 LC.
Fiori, Singh, Tacca, Tringali - 18:31 Tuesday 02 October 2018 (42879) Print this report

Today, we moved one seismometer from the "supporting beam" to the "carried beam" (both around 350 m from BS). Measurment started at 15.30 LC

Images attached to this comment
Tringali, Fiori, Singh, Tacca - 16:34 Wednesday 03 October 2018 (42889) Print this report

Today, between 14:28 and 15:58 LC, we brought a battery to 50m from BS, moved one sismometer on "carried beam" to 50m from BS, left the other one (where it was) on "carried beam" @350m from BS.

Measurment started at 15:05 LC.

Images attached to this comment
fiori, singh, tacca, tringali - 18:58 Thursday 04 October 2018 (42915) Print this report
Images attached to this comment
fiori, singh, sposito, tacca, tringali - 16:04 Friday 05 October 2018 (42927) Print this report

Today, around 14:16 LC, we removed the measuring instruments.

Search Help
×