Reports 1-1 of 1 Clear search Modify search
AdV-TCS (TCS studies actuation (simulations + experiments))
aiello, casanueva, nardecchia - 1:13 Friday 17 August 2018 (42464) Print this report
DAS powers tuning 2

At 17.42 LT the ITF has been locked in low Noise 1 with TCS ON (Pin/out=[450-900]mW on the NI; Pin/out=[200-400]mW on the WI). We waited for the steady state of the YAG thermal lensing before starting the DAS tests (19.31 LT).

We applied the same powers of the STEP 6 during the shift of 14th August (Pin/out=[350-700]mW on the NI; Pin/out=[200-400]mW on the WI; see entry 42442) since we were not sure of the increase of 56 MHz  because the signal was affected by large fluctuations.

The measurement performed tonight confirmed the increase of the 56 MHz sideband gain already observed in the previous shift and also an improvement of the dark fringe (see figure 1).

We were forced to stop the measurement for 3 hr because of the earthquakes in Molise and Japan (see operator report entry).

 

At 22.22LT a new stable lock has been achieved. We started a new measurement, STEP 7, by applying Pin/out =[100- 200]mW on the WI and Pin/out=[350-700] mW on the NI.

A slightly increase of the gain has also been observed.

Thus we leave the ITF with these DAS powers.

Images attached to this report
Comments to this report:
aiello, nardecchia - 10:13 Friday 17 August 2018 (42465) Print this report

The attached figure shows the bahaviour of B1p, 56MHz sideband gain and B7 B8 during the nigth (up to t=11000s TCS tests were ongoing). 

The sideband gain was stable around 8 to be compared with G=6 with TCS OFF (see entry 42425).

Images attached to this comment
Search Help
×

Warning

×