Reports 1-1 of 1 Clear search Modify search
AdV-ISC (Sensing and control implementation)
bersanetti - 18:05 Friday 03 August 2018 (42321) Print this report
Update of Alpha Subtraction & Longitudinal Noise Budget

This afternoon I made a standard noise injection, only on DARM and MICH; GPSs are stored in /virgoData/NoiseInjections/LSC/LSC_injection-1217341578.txt. The purpose was to re-compute Alpha, which was not yet done with 25 W (which is now 23.5 W actually).

In Figure 1 there is the the new computed subtraction and the old measured one; in Figure 2 we can see a very good reduction of the MICH-to-DARM coherence, but only a very small improvement on DARM itself, possibly meaning that despite the sub-par subtraction DARM was not limited by MICH and/or the non-linear part of their coupling is now more relevant than in the past.

A second set of noise injections has been done (GPSs are stored in /virgoData/NoiseInjections/LSC/LSC_injection-1217345365.txt) and the resulting longitudinal noise budget is in Figure 3. The single loop measurements are in Figures 4 to 6.

Images attached to this report
Search Help
×

Warning

Error

The present report has been modified outside this window. Please check for its integrity in the main page.

Refreshing this page will move this report into drafts.

×