Infrastructures Monitoring (Infrastructure Monitoring)majorana - 18:07 Friday 16 December 2011 (30554)
Print this reportTopographic/GPSFrom Nov 14 to Nov 17 the Topographic Survey group performed a campaign of measurements in the centrale area and long the N Arm. The activity will be reported in detail by A. Paoli. During the inspection of NE tower base, while removing the box covering the laser of transversal optical lever, the laser was misaligned by mistake because the bench screws were not tightly fixed. In orderr to fix the problem it is enough to realign the bench by rotating it. The control of F7 X is affected so please leave it open.
Comments to this report:
majorana - 18:36 Friday 16 December 2011 (30556)
Print this reportThe Topographic Survey was performed from Dec 14th to Dec 17th.