Reports 1-1 of 1 Clear search Modify search
Detection system (Detection system)
Tacca, Canuel, Marque - 16:48 Tuesday 09 August 2011 (30068) Print this report
B1 setup moved from EDB to the small bench attached to the tower
This morning, during the maintenance, we finally moved the B1 setup from the External Detection Bench to the small bench attached to the tower. This small bench has been installed already before the run.
The B1 setup is exactly the same (see picture). The only difference is the length of the optical path in air. Before: 120cm. Now: 55cm.
Looking at the sensitivity in this configuration, there seems to be no difference apart from 2 small structures at 65 and 220Hz, which are mechanical resonances of the small tower as seen by the seismometer SETODE01. There is clear coherence (see plot).

Note:
In order to reconnect as before: d2 cable <-> d44 photodiode, d4 cable <-> d41 photodiode.
Images attached to this report
Comments to this report:
Marque - 16:49 Tuesday 09 August 2011 (30069) Print this report
We did not realigned the SFP after this operation. Ignore red flag for the time being.
Search Help
×

Warning

Error

The present report has been modified outside this window. Please check for its integrity in the main page.

Refreshing this page will move this report into drafts.

×