12_02_2024 during the daily meeting Benoit has stopped the NCAL rotator at NE between 14:42 and 14:45 UTC * glitch at 14:37 UTC * glitch at 15:06 UTC Paolo has disconnected all the coils of the NI mirrors at 15:21:11 UTC * glitch at 15:33:55 Paolo has reconnected the coils of the NI mirrors at 15:34:40 * small glitch at 15:38:14 at 15:39:10 UTC there was a decrease of 50,100 and 150 Hz lines ***** UNLOCK of the ITF at 16:00 UTC ****** Monica and Dunia entered in the NE tower at 15:49 UTC The PCAL power supply was switched off at 15:54 UTC The manual switched of both PCAL and NCAL was done 1 minute before Monica and Dunia exited the NE tower at 16:02 UTC They went to the WE tower and switched off the PCAL ****************************************************** The RGA between NI and beam splitter was switched off at 16:25 UTC After the next unlock the cable of the RGA will be disconnected. * glitch 16:58:29 ******* CEB Operations ****** 17:04 disactivated ethernet loop before entering in CEB switched off env-imms7 CEB installed into DAQ room (INJ2 rack) at 17:09:30 UTC CHO:NI_MIR_COIL_UL_TE CH1:TCS_NI_RH_TE CH2:NI_BOTTOM_TE1 CH3:WI_MIR_COIL_DR_TE CH4:TCS_WI_RH_TE CH5:WI_BOTTOM_TE1 CH6:PR_MIR_COIL_UL CH7:TCS_PR_RH_TE CH8:SR_MIR_COIL_UL_TE CH9:TCS_SR * anomalous glitch 17:23:16 UTC * glitch 17:27:18 UTC * small glitch 17:34 UTC * small glitch 17:39 UTC (Federico switched on env-imms7 CEB) * glitch 17:57:10 UTC Federico switched off again env-imms7 and switched it on at 18:08:09 UTC a glitch appeared again at the switching on * glitch 18:24:17 UTC ****** WEB operations ****** switched off env-imms12 WEB at 18:47:30 CH13:WE_MAR_COIL_FL_TE CH14:WE_MIR_COIL_UL_TE CH15:TCS_WE_RH_TE cables CH13, CH14, CH15 disconnected at 18:49:00 * glitch at 18:51 cables CH13, CH14, CH15 reconnected at 18:53:00 switched on env-imms12 WEB at 18:56:00 ****** NEB operations ****** cables CH13, CH14 and CH15 of env-imms41 NEB disconnected at 19:20:00 * glitch at 19:20:40 switched off newtonian noise array at 19:35:00 switched off env-imms 41 NEB at 19:39:00 CH13:NE_MIR_COIL_UL_TE CH14:TCS_NE_RH_TE CH15:?? * glitch at 19:47:46 reconnected cables CH13, CH14 and CH15 at 19:52:00 switched on env-imms 41 NEB switched on newtonian noise array at 19:57:00