ITF found in Science mode.
The ITF unlocked at 2:22 UTC and the unlock seems to be correlated to a problem of DAQ/PR; see attached plot and the log file of ISC_Fb:
2024-04-26-02h22m33-UTC>ERROR..-[TfbSource::StoreData] producer Sc_PR: overflow at GPS 1398133371.999912050 (received 2021 / expected 2000) (1323 times)
This kind of behaviour is something similar to what already reported in the entry: 63958.
At the next relock the lock of the CITF took more than 30 minutes (I also performed the manual prealignment twice); once the CITF was locked LN3_SQZ was achieved at the first attempt and Science mode was set 3:58 UTC.
Gurad tours (time in UTC)
From 21:30 to 22:00; from 23:30 to 0:00; from 1:30 to 2:00; from 3:15 to 3:34.