Reports 1-1 of 1 Clear search Modify search
Detector Operation (Operations Report)
berni - 23:00 Tuesday 13 November 2018 (43565) Print this report
Operator report - Afternoon shift
The shift was basically dedicated to the ITF recovery: WI CO2 laser chiller failure and then there was troubles with the ISYS.

At 20:30 UTC we could reach LOW_NOISE_3 and started the activity on OMC alignment and mode matching.
At 20:50 UTC the ITF unlocked and DET people from remote started working with only NI mirror aligned, activity concluded at 21:40 UTC.

After that started the activity of the SQUEEZING with the same configuration,
Search Help
×

Warning

×