This morning was swap the master laser.
The ML power at the input of the Slave laser is now 510 mW instead of 390mW previusly.
Was also reduced the BPC corrections but due to the cumulated drift last months the beam was clipped on
the last mirrors (EIB_M6 and EIB_M7). The beam was manually recentered on the optics of the EIB.
The AA matrix measurement is ongoing.