Operator Report - Morning shift 16/10

ITF found in LOCKED_RECOMBINED. The shift was dedicated to the work on SDB2 bench.

At 6:00 UTC started the planned maintenance, below the list of the activities communicated to the control room:

  •     7.14 UTC M. D'Andrea switched off the IPS at WE. 8.07UTC IPS switched on again
  •     vacuum activities (nitrogen refill)
  •     grass cutting at WEB and NEB areas
  •     N. Menzione, M. Ciardelli, and the cleaning company performed cleaning operation at NEB and WEB (clean areas)
  •     G.Pillant and E. Genin replaced the master laser
  •     D. Soldani performed a general check on compressed air and boilers in all the Virgo site
  •     Flooring work in the entrance near cabling lab 
  •     R. Cavalieri, F. Nenci, and B. Montanari replaced the broken cable of the IPS current sensors at MCB

TCS

Standard checks and refill of TCS chillers.

DMS

As requested by R. Cavalieri i have unshelved this two flag rms_ENV_MCB_UPS_CURR_T_2 and rms_ENV_MCB_IPS_CURR_S_2.


Pending

"UTA DET" still in "Portata Nominale"