Reports 1-1 of 1 Clear search Modify search
AdV-ISC (Alignment control scheme conceptual design)
casanueva, mantovani - 15:41 Friday 15 June 2018 (41854) Print this report
B1p quadrants test

Thi smorning we removed the individual demodulation phases per sector of the quadrants on B1p to make some tests.

First of all we have injected a line @ 2Hz in WE and BS

  GPS
WE tx 1213080555
WE ty 1213081660
BS tx 1213081839
BS ty 1213081375

We also re-tuned the phases of both quadrants but we basicaly see the same signal in both by eye, see FIgure 1. We will post a more detailed analysis with numbers but it is quite clear that they are very similar.

Images attached to this report
Search Help
×

Warning

×