After the issue reported in the entry #40650, we open the tower today.
Once entered in the INJ tower we found as expected the M1 mount strongly tilted (see attached pictures).
The IB was controled as PR in the last known good position (02/02/2018). Using an Half wave plate we bypass the IMC and
using an other one on the IB we recover the right polarization before the faraday isolator.
Using the faulty picomotor we were able to recover the B2 beam reflected by the PR. The picomotor was moved by about
30.000 steps which is corresponding to a tilt of about 11 mrad position (from -1920 to -30627) !
From the software side, no movements are identified in the logfile...
We will report the reason of the problem once understood.
NB : it seems the "chiocciolone" of the INJ suspension doesn't work, to be checked by SAT asap.