Reports 1-1 of 1 Clear search Modify search
AdV-SAT (Long SAs Upgrade Installation (End Towers))
berni, gherardini - 12:24 Thursday 22 February 2018 (40656) Print this report
WE electrical check
After the operations on the WE suspension: opening of the upper part and IVC, filter tuning, installation and removal of the dummy payload we checked the electrical connections of the cables inside the tower: F,R,S,T,U,V,W,Z.

everything is fine except F0 trolley 01 and of range that was short-circuit, fixed.
Search Help
×

Warning

×