AdV-SAT (Long SAs Upgrade Installation (End Towers))berni, gherardini - 12:24 Thursday 22 February 2018 (40656)
Print this reportWE electrical checkAfter the operations on the WE suspension: opening of the upper part and IVC, filter tuning, installation and removal of the dummy payload we checked the electrical connections of the cables inside the tower: F,R,S,T,U,V,W,Z.
everything is fine except F0 trolley 01 and of range that was short-circuit, fixed.