Reports 1-1 of 1 Clear search Modify search
Detector Operation (Operations Report)
Gherardini - 23:01 Friday 22 September 2017 (39559) Print this report
Operator Report - afternoon shift 22/09
This shift was dedicated to alignment, the activity went on without any major problem, activity in progress...

-automation
because of some mistake/typo we had to change a parameter in the INJ_MAIN.ini file, using the "LOAD" button on the client was not enough I had to stop & start the INJ_MAIN metatron node to make the modification effective.

-inf
trying to rise up the laser lab temperature that after the problem of the air conditioning system is decreased of 1 degree at around 12:00UTC I closed half door between the laser lab and the SIB2 room, up to now the action seems to not have a big effect (see plot).

Images attached to this report
Search Help
×

Warning

×