All the afternoon shift was dedicated to DET activity, wich finished at 20:50UTC.
At 17:00UTC an earthquake in Japan, magnitude 6.2, unlocked ITF and prevented the locking until 18:00UTC. Finally, at 18:22UTC ITF relocked in LOW_NOISE_3.
20:50:UTC - Stopped Commissioning Mode.
ITF left locked in LOW_NOISE_3
DAQ
18:16UTC, 18:19UTC, 19:09UTC missing data