Reports 1-1 of 1 Clear search Modify search
AdV-COM (AdV commissioning (1st part) )
G. Ballardin and Vacuum team - 11:12 Monday 24 April 2017 (37344) Print this report
Comment to Recovery after network outage (37340)
Because of the problem reported in #37341 it was necessary to restart the PLC for both INJ and DET small-cryotraps:
neither of the PLCs were accessible via the network. In the meantime I also updated the firmware to read temperatures better.
Now the temperatures of both small-cryotraps are conistent.
Search Help
×

Warning

×