Reports 1-1 of 1 Clear search Modify search
AdV-COM (AdV commissioning (1st part) )
mantovani, ruggi - 11:38 Thursday 23 March 2017 (37001) Print this report
Comment to Post-shift relock attempts (36991)

The problem was that in Metatron the angular drift control for the End mirror was not switched off when the ITF unlocks. Thus the two cavity mirrors were misaligned during the lock acquisition. Now the switching off has been added in the down state.

I put back the SSFS gains.

Search Help
×

Warning

×