Operator Report - Daily shift

Below the list of the today's activities:

- squeezer board re-installation & cabling (in progress);
- green beam alignment on west arm cavity by Matteo, Raffaele and Romain (in progress);

Sub-system reports

SUSP

at 9:10UTC the PR local control get crazy and the F7 controls opened by the guardian because of one of the two SLED has switched off, probably due to some human activity around the tower base; with the help of Paolo from remote the SLED had been switched on and the control restored.

Comments to this report:
chiummo - 18:10 Friday 23 October 2020 (49736) Print this report

Taking advantage of the accident to PR control, I resetted the thermal correction to the master laser which had been quite high in the past days. INJ was relocked afterward.