This morning at ~7h55 utc we could engage the angular and position loop controls of SNEB without any problem. The setpoints were similar to what they were in March at the end of the run (see comparison between Fig.1 and Fig.2).
This morning at ~7h55 utc we could engage the angular and position loop controls of SNEB without any problem. The setpoints were similar to what they were in March at the end of the run (see comparison between Fig.1 and Fig.2).