Yesterday, we have measured the throughput power of SIB1. As shown on the attached picture, we measured the transmitted power out of the INJ Tower with an high power calorimeter and a 1m focal length “lentone” (old Virgo end bench lens). We have measured 15.7W output power (taking account lens transitivity) for 21.6W measured before the last mirror of the EIB. -------------------------------------- Total throughput losses on SIB1 : <28% -------------------------------------- Losses Budget and SIB1 Throughput: IMC mismatching: 8.9% M11 transitivity: 1% Faraday Isolator Throughput losses 5% IPC Throughput losses 6% (see log entry 31247) MC throughput losses : 28.0-20.9 = 7.1% So, if we are able to recover the previous matching on the IMC cavity about 94%, it should be possible to reach 25% of losses on SIB1 and we hope 30% for all the injection system as expected.